Machinery FOR Food Beverage Cereal

5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production ...

Zhangjiagang Beyond Machinery Co., Ltd.
  • Warranty:1
  • Processing Material:Garden Products
  • Application:Beverage
  • Customized:Customized
  • Certification:CE
  • Power Source:Electric

Base Info

  • Model NO.:QGF
  • Automatic Grade:Automatic
  • Certificate:ISO9001, SGS
  • Power:by Order
  • Control:PLC
  • PLC:Mitsubishi
  • Transport Package:International Standard Export Packages
  • Specification:CE; SGS
  • Trademark:Beyond
  • Origin:Zhangjiagang, Jiangsu, China
  • HS Code:8422301090
  • Production Capacity:20sets Per Month

Description

380V/50HzWeight(kg)68012001600200035004500
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)