300L 500L Brewery Beer Equipment for Pub/Hotel/Restaurant
Shandong Meto Intelligent Equipment Co., Ltd.- Certification:CE, ISO9001, TUV
- Customized:Customized
- Application:Beer Brewing,Beer Brewery
- Processing Material:Natural Ingredients, Water,Malt,Hops,Yeast
- Power Source:Electric Steam,Gas or Direct Fire
- Automatic Grade:Semi-Automatic
Base Info
- After Sales Service:Installation and Equipment Commission
- Technology:Offer Auto CAD and 3D Design Drawing
- Insulation:Polyurethane Foam
- Cooling Unit:Chiller with Glycol Tank
- Control Unit:Temp. Controller, HMI, PLC or Touching Screen
- Brewhouse Heating:Steam Jacket , Electric Tube, Direct Fire
- Polish Finish:0.4-0.6um
- Material Thickness:Inner:3.0mm, Exteior:2.0mm
- Beer Equipment Weight:1000kg-10000kg
- Dimension(L*W*H):Depends on Capacity
- Voltage:220V,380V,Adjustable
- Processing Types:Beer Brewing Equipment
- Model NO.:MT-300L, 500L
- Main Material:SUS304 Stainless Steel
- Transport Package:Plastic Film, Plywood Case; Container;
- Specification:Customized
- Trademark:METO
- Origin:Shandong, China
- HS Code:84384000
- Production Capacity:10 Set,Sets Per Month Stainless Steel Brewhouse
Description
Mash/Lauter tun+Brew kettle/whirlpool tank
1.Lauter&storage tank+brew kettle/whirlpool tank
2.Lauter&whirlpool tank ,+brew kettle
3.Lauter&HLT +brewkettle/whirlpool tank
2.Mash tun+ lauter tank + brewkettle/whirlpool tank
Heating source:Steam,Electric,direct fire
SUS304/Red copper
(The number according to customer requirements)
Drying hop port to brew IPA
Dimple Plate Cooling jacket
Carbonation port to fill CO2
Auger System
Grain Case
Grist Hydrator
Piping flow panel for Brewhouse
Brewhouse Separate PLC Controller
Steam Boiler Customized
...
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the travelling cost and locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer for the extended installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc. should be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.